1
|
WFLH12WLS0120A
|
MODULES PACKAGES EQUIPMENT AND MATERIALS FOR BLACKGOLD PROJECTPIPERACK MODULE 3RD SHIPMENT PO NO.: PO NO. 7T98-PO-CONST-001 FREIGHT PREPAID ALSO NOTIFY PARTY
|
HARVEST OPERATIONS CORP.
|
GS ENGINEERING AND CONSTRUCTION COR
|
2013-02-04
|
South Korea
|
5448000 Kgs
|
17 PKG
|
|
2
|
WLWHKR1290134
|
VESSEL & SHOP TANK TOTAL 2 PACKAGES H.S CODE WASTE OIL TANK 8479.89.9090
|
HARVEST OPERATIONS CORP.
|
GS ENGINEERING AND CONSTRUCTION COR
|
2013-01-23
|
South Korea
|
23900 Kgs
|
2 UNT
|
|
3
|
WFLH12WLS0111A
|
MODULES 12 PACKAGES EQUIPMENT AND MATERIALSFOR BLACKGOLD PROJECT PIPERACK MODULE 2ND S HIPMENT
|
HARVEST OPERATION CORP.
|
GS ENGINEERING AND CONSTRUCTION COR
|
2013-01-10
|
South Korea
|
276407 Kgs
|
12 PKG
|
|
4
|
WFLH12WLS0102B
|
MACHINERY 2 PACKAGES EQUIPMENT AND MATERIALS FOR BLACKGOLD PROJECTPIGGING EQUIP PO NO.: PONO. 7T98-PO-CONST-001 FREIGHT PREPAID ALSO NOTIFY PARTY
|
HARVEST OPERATIONS CORP.
|
GSENGINEERING AND CONSTRUCTION COR
|
2012-12-11
|
South Korea
|
948 Kgs
|
2 PKG
|
|
5
|
WFLH12WLS0088A
|
MACHINERY27 PACKAGES EQUIPMENT AND MATERIA LS FOR BLACKGOLD PROJECT PIPERACK MODULE 1STSHIPMENT PO NO. 7T98-PO-CONST-001 FREIGHT PREPAID DECK CARGO COVER TARPAULIN.VSL NOT RESPONSI CARGO LOADED IN DECK AT THE SOLE RISK OF THE
|
HARVEST OPERATION CORP.
|
GS ENGINEERING AND CONSTRUCTION COR
|
2012-11-04
|
|
488208 Kgs
|
27 UNT
|